OBJECTIVES

  • Design and manufacture in compliance with Water Corporation specifications.
  • A sound level limit of 65 dB(A) @7m.
  • Reliable and competitive product.
  • Two sources of power to back up the water pump’s power supply and the water treatment
    facility downstream.

SOLUTION

Two x 2800kVA and one x 3300 kVA generators equipped with MTU engines were set up in
soundproofed containers to provide a reliable source of power.

The containers were specifically designed with sound barrier panels, exhaust silencers and
vibration mounts between the generator and the base to reach a challenging sound level of 65 dB(A) @7m.

The solution also integrates a full 7 days fuel supply and bypass system. The cooling system was installed on the roof and allows the generator to run under extreme conditions (up to 42°C).

BENEFITS

The flexibility of CAPS generators powered by Kohler made it possible to meet the exacting and challenging requirements of the water corporation brief. Mundaring is now equipped with a customised solution fitting their need for a reliable, robust and quiet source of power.

The CAPS maintenance contract and the 24/7 assistance combined with the engineering
development achieved on this project will provide a complete and durable power solution to the
Mundaring Water Works.

YOU CAN BENEFIT TOO

Contact CAPS today to discuss your requirements and receive an obligation-free assessment of your site!

By submitting this request, you agree to our Terms and that you have read our Data Use Policy.

Please leave this field empty.