Case Study: North Sydney Data Centre

Book now

By submitting this request, you agree to our Terms and that you have read our Data Use Policy.

Please leave this field empty.

Book a service

Contact us now

By submitting this request, you agree to our Terms and that you have read our Data Use Policy.

Please leave this field empty.

Request a quote

Case Study: North Sydney Data Centre

Posted on 19th February 2018 in

North Sydney Data Centre_Backup power solution by CAPS Australia

Data center demand has been driven by the rapid rise of digitisation and the increasing importance of data with information-centric trends such as e-commerce, social networking, and file sharing.

Stringent data-related regulatory requirements and advancements such as cloud computing
has especially increased the demand for quality data centres.

In the event of a power outage, it is imperative that data centres have access to a reliable, fail-safe backup power supply. Any downtime can have a devastating effect not only on business operations but on the credibility and reputation of the businesses affected.

OBJECTIVES

A data centre located in North Sydney, NSW, required a robust backup power supply so
they could store, protect and access their data on demand to continually operate.

SOLUTION

  • KERYS control system to enable parallel operation of each set with other similar sets.
  • Supply and installation work of 1 x 1,000 litre day tank with level switches and indicator.
  • A mild steel exhaust silencer with stainless steel pipework terminating horizontally outside the plant-room, lagged and sheathed in the plant-room only.
  • Set-mounted heat exchanger including associated engine-heat exchanger pipework.
  • Horizontal radiator with vertical air flow suitable for mounting on the roof.
  • Set-mounted motor-operated 3600A circuit breaker.

BENEFITS

CAPS supplied a dependable, scalable and upgradable backup power system capable of delivering uninterruptible power as and when needed. The first two diesel generators were delivered for completion of commissioning within four months from the date of order.

YOU CAN BENEFIT TOO

Contact CAPS today to discuss your requirements and receive an obligation-free assessment of your site!

By submitting this request, you agree to our Terms and that you have read our Data Use Policy.

Please leave this field empty.