Case Study: North Sydney Data Centre

Posted on 19th February 2018 in

Data center demand has been driven by the rapid rise of digitisation and the increasing importance of data with information-centric trends such as e-commerce, social networking, and file sharing. Stringent data-related regulatory requirements and advancements such as cloud computing has especially increased the demand for quality data centres. In the event of a power outage, it…

Case Study: Mundaring Water Works

Posted on 21st January 2018 in

OBJECTIVES Design and manufacture in compliance with Water Corporation specifications. A sound level limit of 65 dB(A) @7m. Reliable and competitive product. Two sources of power to back up the water pump’s power supply and the water treatment facility downstream. SOLUTION Two x 2800kVA and one x 3300 kVA generators equipped with MTU engines were set…

Case Study: Sydney CBD Office Complex

Posted on 11th November 2017 in

The office complex involved in this project is a Grade-A building delivering the highest quality amenities, efficiency, sustainability and design. The building, located on George Street in Sydney’s bustling CBD, acquired a 5 star Green Star design, which demonstrates a dedication to minimising environmental impacts and future energy costs for a healthy working environment. CAPS…

Case Study: Reedy Creek Gas Power Plan

Posted on 23rd October 2017 in

Clarke Energy was appointed to build a power station in Central Queensland for a coal seam gas plant. In order to back up their power station, they required two generators to act as a prime power source during the construction of the station (which consisted of 10 x 3 MW gas engine generators sets once…

Case Study: Cairns Base Hospital

Posted on 2nd September 2017 in

OBJECTIVES Complete design and manufacture in compliance with Australian standards for emergency power supplies in hospitals. A N+1 power solution equipped with a strong control detection system that quickly swings generators into action. A maximum noise level of 85 dB(A) @ 1m. An emission regulated engine to meet the hospital’s environmental goals. Fuel capacity to…

Case Study: Barangaroo South, Sydney NSW

Posted on 3rd August 2017 in

The contract, conceivably the most significant in CAPS’ 38 year history, was recently finalised. This was CAPS’ second time working with project developer, Lend Lease, following a successful bid for the installation of two 2,000 kVA generator sets into Sydney’s MidCity during its construction in 2009. REQUIREMENT Lend Lease’s latest development, Barangaroo South, is a…